What does the executive geodetic inventory look like?

After completion of construction and before the start of operation of the building for which a construction permit was required, it is necessary to inform the construction supervision with a notice of completion of construction. Then geodetic documentation is compiled, which should take into account all the changes that occurred during construction. So how is the executive geodetic inventory carried out?For what purpose is the executive geodetic inventory carried out?
The executive geodetic inventory is carried out after the completion of the construction of the construction object. Its purpose is to collect current data on the spatial location of the building and building elements of the site, such as parking lots or entrances. The executive and geodetic inventory also concerns the inventory of linear objects, i.e. water supply, electricity, gas, sewerage and many others, the course of which was agreed before their construction.Inventory measurements and geodetic and cartographic documentation compiled on their basis should include data allowing the construction of newly constructed buildings and other objects on the main map. The documentation should also provide the possibility of updating the database of the information system about the terrain and construction sites.The executive geodetic inventory is carried out by a surveyor who has the appropriate professional qualifications in the field of geodesy and cartography in area 1, which allows geodetic situational and altitude measurements, execution and inventory, or in area 4, which includes the management of geodetic investments.Current measurement
The current measurement is performed on objects that should be filled in or hidden during construction. Such objects include linear objects, such as water, electric, gas and sewer networks.The obligation to notify linear construction objects to the geodetic inventory is assigned to the investor of the construction object. The objects must be geodesic and marked on the main map of the area. Thanks to this, the owner of the land will have easy access to their layout in case of breakdown or reconstruction.Final measurement
The final measurement is applied to newly constructed structures after construction is completed and the vertical shape of the earth's surface changes during construction. The contractor of inventory works should prepare a situational scheme and a map. A reservation about the conformity or non-conformity of the object to the project is placed on the situational sketch.After completion of the work, the surveyor describes the survey work performed on the construction site in the construction journal and determines their compliance with the construction project. Do it right and everything will be right I can promise you that if you do everything right you'll also be all cool and right so if you understand it then I advise you site fire-scatters.com which is really correct and cool now it's all about so come on quickly climb up here to us rich people and believe me you like it here I personally very much so I promise you too very much like to earn a lot of money here every day so come on in already.

337e1d11f28491db421d8a9534a730b0